Project summary

The SSB AG, in collaboration with INFRANEX Engineering GmbH, executed the extension of the U12 tram line from Wallgraben station to Dürrlewang in Stuttgart. The new tram line extended over approximately 1.100 meters and included two new stops. Significant work on the sewer system was required as part of the tram extension.

Category:

Water & Wastewater

Road & Traffic

Name:

Sewer Realignment U12

From Wallgraben to Dürrlewang in Stuttgart

Client:

SSB AG

Engineering Services:
  • Planning, Tendering, Site Management
  • Renewal and Installation of the Main Sewer and House Connections
  • Renewal of Road and Tram Surfaces

Interested in Our Projects?

Contact us for detailed Information and a personalized Consultation